All SANDA SOFTWARE

ADVANCED PLANNING AND SCHEDULING

Based on the order delivery time, compre-hensively consider the production line layout of the factory and the production capacity and process configuration of the actual capacity, and intelligently formulate the optimal production schedule. At the same time, according to the actual data in operation and the equipment repair and maintenance situation, the generated plan is dynamically adjusted, in the automatic results, manual correction can also be made.and each correction system will dynamically update the status and give reasonable feedback to the operator,

 

Highlights

  1. Arbitrarily selected, and the production schedule ofeach process can be pushed down;
  2. Connect the planning layer, equipment layer andon-site real-time data and dynamically adjust;
  3. Support automatic calculation of raw and auxiliarymaterials and generation of purchase requisitions;

Support urgent handling of urgent orders.

es_ESSpanish